Knowledge base
Concrete pumping guides
Straight answers to the questions builders, owner-builders and contractors ask before a pour: which pump suits the site, what it costs, how to get the site ready, and how Far North Queensland weather and distances change the plan.
Stage 1 of 3 · Before you book
Choosing the right concrete pump
Line pump or boom pump, how far each can reach, and what the concrete itself needs to pump well.

How far can a concrete pump reach?
A 31 m boom reaches about 31 m up but only about 23.5 to 26.3 m out. How boom and line pump reach works, and what fits a Far North Queensland site.
9 min read ·

Do I need a concrete pump for my job?
You need a concrete pump when the agitator truck can't park within chute reach of the pour. Run our five-check access test for FNQ blocks before you book.
8 min read ·

What is pump mix concrete?
Pump mix is concrete designed to pass through a pump and line. What slump means on an Australian order, what to tell the plant, and why site water hurts.
13 min read ·

How does a concrete pump work?
A boom or line concrete pump uses two hydraulic pistons and a switching valve to push concrete from the hopper through the line or boom. What each part does for your pour.
12 min read ·

Cement vs concrete: what is the difference?
Cement is a powder; concrete is cement, water, sand and stone. How GP and GB cement differ, where mortar fits, and what arrives in the truck.
10 min read ·

What causes a concrete pump to block, and how to avoid it
What blocks a concrete pump: mix faults, gaps between trucks, lumps from the truck and wear in the line. The causes you control, priming and safety.
11 min read ·

Exposed aggregate concrete: what it is and how it gets poured
Exposed aggregate is concrete with the surface paste washed off to show the stone. How it is made, pumping the mix, Queensland washout rules and sealing.
13 min read ·

What is shotcrete, and when is sprayed concrete the right method?
Shotcrete is concrete sprayed onto a surface at high velocity. Wet-mix vs dry-mix (gunite), the jobs it suits in FNQ and what the engineer specifies.
10 min read ·

Core filling block walls with a concrete pump
How much concrete core filling a block wall takes, per 100 blocks and per square metre, what to tell the supplier and how to prep the wall for the pump.
12 min read ·

Concrete admixtures: what retarders, plasticisers and accelerators do to a pumped pour
Admixtures change how concrete sets and flows. The main types under AS 1478.1, why a plasticiser beats site water on a pump, and who decides what goes in.
13 min read ·
Stage 2 of 3 · Booking and site prep
Costs, booking and site preparation
What a pump costs, how much concrete to order, and how to have the site and the paperwork ready.

How much concrete do I need?
Multiply length by width by depth in metres, then add about 10% for wastage. Use the calculator and worked driveway, shed slab and path examples.
8 min read ·

How to prepare your site for a concrete pump
A concrete pump needs firm ground, clear truck access, distance from powerlines and a washout area. A Queensland site checklist built from the code of practice.
11 min read ·

Do you need a licence to operate a concrete pump?
Yes for a boom pump: Queensland operators need a PB high risk work licence. What line pumps need, what the code expects on site and what to ask.
8 min read ·

How much concrete does a concrete truck carry?
Full-size Australian agitators carry up to about 7 or 8 cubic metres and mini-mix trucks about 2 to 3.6. Sizes, loaded weights and trucks needed.
13 min read ·

Concrete washout: what it is and where the slurry has to go
Concrete washout is the slurry left after rinsing pumps, chutes and tools. Why Queensland law keeps it out of drains, washout set-ups that work and disposal.
12 min read ·

Concrete pumping SWMS: what Queensland requires and who writes it
When a pumped pour needs a SWMS in Queensland, what the pump operator's SWMS covers versus the builder's, the hazards the code lists and a pre-pour check.
13 min read ·

How much concrete do you need for post holes and piers?
Work out concrete for round post and pier holes in metres: the cylinder formula, a per-metre table, worked fence and pier examples, bags and allowance.
11 min read ·

Bagged concrete or ready-mix: which suits your job?
Bags suit small jobs; ready-mix suits bigger pours. Bag yields per cubic metre, mixing labour, batch consistency, small-load fees and where a pump fits.
11 min read ·

Do you need a permit to set up a concrete pump on the road?
When a concrete pump sets up on a road or footpath in Far North Queensland you need council or TMR approval and often traffic control. Who applies and lead times.
12 min read ·
Stage 3 of 3 · On the day
Pour-day conditions in the tropics
Rain, heat and the clock: planning a pour around Far North Queensland weather and travel times.

What is the 90 minute rule for concrete?
Concrete should be discharged within 90 minutes of mixing starting at the plant, the AS 1379-2007 limit. How heat, travel and delays shrink it in FNQ.
9 min read ·

How to pour concrete on a slope
Place sloping concrete from the bottom up, keep driveways within council gradient limits and texture the surface for grip. FNQ driveway rules explained.
11 min read ·

Pouring concrete in hot weather: how to plan a pour in the tropics
You can pour concrete in hot weather with precautions. CCAA's 30 and 35 degree thresholds, FNQ build-up climate data and a pour-day checklist for pumped jobs.
12 min read ·

How long does a concrete pour take with a pump?
A pumped pour can go no faster than the trucks arrive and unload, whatever the pump's rated output. Worked examples, setup, washout and planning.
11 min read ·

How to cure concrete after the pour
How to cure concrete: start straight after finishing and keep it moist for at least 3 days, 7 preferred. CCAA's water, cover and compound methods, for FNQ.
13 min read ·

What time can a concrete pour start in Queensland?
Queensland law limits noisy building work to 6.30am to 6.30pm, Monday to Saturday. What that means for an early concrete pour in FNQ, and when council hours apply.
12 min read ·
Ready to book a pump?
See what we pump for homes, commercial builds and civil projects, or check the pumps in our fleet.