Concrete pump truck servicing Far North Queensland

Concrete Pumping Stratford

Getting concrete past the house, clear of the service lines and onto firm ground: we plan the pump and its set-up spot before the truck leaves Mareeba.

Concrete pumping for Stratford homeowners, owner-builders and concreters

The council-hosted Stratford Heritage Trail brochure describes many traditional wooden Queenslander houses in the surrounding streets, some dating back almost 100 years. For a pour beside or behind a home like that, the pump choice comes first. Far Northern Concrete Pumping runs 31m, 28m and 20m boom pumps plus line pumping, so concrete can go over the roof or along the side path to the formwork. We work with homeowners, owner-builders, builders and concreters, and small pours such as garden paths, patios and shed slabs are welcome. We travel from Mareeba on a regular Cairns run, so book ahead. Tell us the access path, any overhead lines and the size of the pour, and we will match the pump to the site.

In Stratford, the person booking a pump for a home pour is likely to be the person who lives there. At the 2021 Census, 30.2% of occupied private dwellings were owned outright and 40.3% owned with a mortgage, about 70.5% owner-occupied in all, against 29.1% rented. For an owner-occupier that tends to mean a project on their own place, such as a garden path, a patio or a shed slab, and small pours like these are welcome. The homes vary in size too: 34.6% had four or more bedrooms and 27.0% had two, so one job may be a long back-yard slab and the next a short path, and we size the pump to suit, from our 20m compact boom to a line pump. At the 2021 Census, 16.3% of occupied private dwellings were semi-detached, row or terrace houses or townhouses, where common property can decide where a truck may stand. Tenants should get their landlord's approval before booking. Tell us how the concrete gets from the street to the pour and how big the pour is, and we will match the pump.

Enquire Now in Stratford

Owner-occupied Stratford homes: what to check before pump day

Queensland's Concrete Pumping Code of Practice 2019 expects the person controlling the site to provide a clear, firm, level set-up area and truck access, with room for the outriggers fully extended, and short legging is avoided because it raises the risk of overturning. So the first check is where a pump truck can stand, with that space kept clear.

Second, check the route. Where a patio or shed slab sits behind the house, the route decides the pump: a line pump suits a pour at or near ground level where a hose can be laid along the ground, and a boom suits a pour that is high, behind a building or large enough that reach and speed matter. As a guide, one manufacturer lists about 26.3 metres of horizontal reach for its 31m boom, but usable reach depends on where the truck can safely stand.

Third, check council's records for your property. Council publishes a 1% AEP predicted flood inundation map covering Freshwater, Stratford and Aeroglen; it says these maps are an indication only, and offers individual property assessments for a fee. The suburb also sits beside Mount Whitfield (364m) and Lumley Hill (325m), part of a reserve declared in 1885. Some sloping blocks may fall within the CairnsPlan 2016 Hillslopes overlay, where excavation and filling over 50m3, a batter or retaining wall over 1.8 metres, or land steeper than 1 in 6 can mean an application is needed. The fact sheet does not list suburbs, so check your own property with council or your builder; we pump the concrete and do not give planning advice.

Fourth, check the date. Our rain guide, drawing on Bureau of Meteorology figures, puts Cairns at more than twice Mareeba's annual rainfall, with about 16 rain days a month from January to March. Because we travel from Mareeba on a regular Cairns run, book ahead and keep a fallback date for a wet-season pour. If a flood watch is issued, council advises monitoring the Cairns Disaster Dashboard and BoM warnings, and we recheck the set-up ground after rain because water in the ground reduces support.

Last, check the lines. WorkSafe Queensland reported that in November 2021 a worker suffered serious burns and another minor injuries when a mobile concrete placing boom contacted an 11kV overhead powerline. Our site guide keeps the boom at least 3 metres from lines up to 132kV, and Ergon Energy's Look up and Live map can help you plan work near overhead lines before pump day.

Concrete Being Poured on Rebar Grid, Construction Site — Far Northern Concrete Pumping, servicing Stratford QLD

Side paths, set-up space and service lines on Stratford blocks

The owner books the pump before the set-up spot is sorted

Why it happens
About seven in ten Stratford homes were owner-occupied at the 2021 Census. Under the Code of Practice, the person controlling the site should provide a clear, firm, level set-up area and truck access.
Why it matters
Without room for the outriggers fully extended the pump cannot set up safely, and short legging is avoided because it raises the risk of overturning.
What we do
We ask for photos of the street frontage and any driveway space, agree the set-up spot with you before booking, and ask that it is kept clear of cars and materials on the day.

The pour sits behind the house with only a side path in

Why it happens
When a patio or shed slab sits behind the house, concrete has to go over the roof by boom or along the side by line.
Why it matters
A boom has to clear the roof and still reach the formwork from where the truck stands. As a guide, one manufacturer lists about 26.3 metres of horizontal reach for its 31m boom, but usable reach depends on the set-up spot.
What we do
We ask for the distance from the kerb to the pour, with any rise and bends, then choose a boom that reaches over the house or a line pump run down the side if the pour is at ground level.

A townhouse pour where common property decides the truck spot

Why it happens
At the 2021 Census, 16.3% of Stratford's occupied private dwellings were semi-detached, row or terrace houses or townhouses, where a shared driveway or common property can sit between the street and the pour.
Why it matters
The pump still needs a clear, firm, level set-up area with truck access, and on common property that space is not one owner's alone to offer.
What we do
We ask you to confirm with your body corporate where a truck may stand, then size the job to the space, using our 20m boom, the compact set-up for tighter suburban blocks, or a line run from the street.

The block's flood status is unchecked before a wet-season pour

Why it happens
Council publishes an indicative 1% AEP predicted flood inundation map covering Freshwater, Stratford and Aeroglen, and offers individual property assessments for a fee, so the check is specific to each property.
Why it matters
Our rain guide, based on Bureau of Meteorology figures, puts Cairns at about 16 rain days a month from January to March, and water in the ground, including mud, reduces support under the outriggers.
What we do
For January to March bookings we suggest you check council's map for your own property, agree a fallback date with us, recheck the set-up ground after rain, and watch the Cairns Disaster Dashboard and BoM warnings if a flood watch is issued.

A level pad is cut into a sloping block before the earthworks are checked

Why it happens
Some sloping blocks may fall within the CairnsPlan 2016 Hillslopes overlay, where a dwelling house is accepted development only if excavation and filling stays within 50m3, each batter or retaining wall is no more than 1.8 metres high, no vegetation damage occurs and the gradient is no steeper than 1 in 6.
Why it matters
Beyond those limits an application is needed, and conditions may include geotechnical certification, which can push back the pour date.
What we do
The fact sheet does not list suburbs, so check your own property with council or your builder before booking; we pump the concrete and do not give planning advice, and we plan the set-up spot once any approvals are in hand.

Overhead service lines between the truck and the pour

Why it happens
A boom working from the street may have to pass service lines on its way to the pour, and our site guide keeps it at least 3 metres from lines up to 132kV.
Why it matters
WorkSafe Queensland reported that in November 2021 a worker suffered serious burns and another minor injuries when a mobile concrete placing boom contacted an 11kV overhead powerline.
What we do
Our high-risk licensed operators plan the boom path around the lines you point out, keeping at least 3 metres from lines up to 132kV, and we suggest checking Ergon Energy's Look up and Live map before the day.
Concrete Pump Truck Driving on a Dirt Road — Far Northern Concrete Pumping, servicing Stratford QLD

Boom and line pumps for Stratford slabs, paths and pads

Boom Pump Hire

Where a Stratford pour sits behind the house, a boom can stay on the street and place concrete over the roof, as long as it keeps at least 3 metres from lines up to 132kV. Our 20m boom is the compact set-up for tighter suburban blocks.

Compare our booms

Line Pumping

A line laid down the side path suits a ground-level pour behind the house, and our compact high-pressure line pump is designed for hard-to-reach pours. Give us the distance, rise and bends from the street.

Boom or line pump?

Residential Concrete Pumping

Garden paths, patios and small shed slabs on established Stratford blocks are welcome, and on townhouse sites we sort the truck position around the shared driveway first.

Residential pours

Concrete Spraying

Concrete spraying is listed among our services for work such as free-form pool surrounds and embankment stabilisation; ask when you call whether it suits your Stratford job.

Enquire about spraying

Family-run from Mareeba since 2014

Far Northern Concrete Pumping is a family partnership that has been operating since 2014, and the Australian Business Register shows the ABN active from April that year. Separately, the team has more than 15 years of experience in the concrete industry. Our only base is in Mareeba, and we cover Cairns suburbs on a regular Cairns run rather than from a depot in Stratford. Our operators are high-risk licensed, as published on our website, which matters most when a boom is lifting concrete over a roof near service lines. The fleet runs 31m, 28m and 20m boom pumps, line pumping and a compact high-pressure line pump for hard-to-reach pours, so the pump is chosen for the site rather than the other way round. We also publish our own guides on site preparation, line versus boom choice and pouring in the rain, drawing on Queensland's Concrete Pumping Code of Practice and Bureau of Meteorology figures.

Planning a path, patio or slab at a Stratford home? Call 0413 345 977 or use the contact page, and tell us where the pour sits, how far it is from the street (with any rise and bends) and where the overhead lines run. Photos of the street frontage and the side access help most. In a townhouse, check with your body corporate where a truck may stand, and if you rent, get your landlord's approval first. Quotes depend on the pump size, time on site, travel from Mareeba and any minimum charge, so the more detail you send, the closer the quote. For a January to March pour, check council's flood map and the BoM warnings before the day, and keep a fallback date in mind.

Describe your pour
Four White Trucks Parked in Front of a Gray Building — Far Northern Concrete Pumping, servicing Stratford QLD

Before you book a Stratford pour

I own my Stratford home. What should I have ready before pump day?

A clear, firm, level spot for the truck with room for the outriggers fully extended, plus truck access, because under the Code of Practice the person controlling the site should provide it. Send photos of the street frontage and the pour area, the distance from the kerb with any rise and bends, and where the overhead lines run. Small owner projects such as garden paths, patios and shed slabs are welcome.

I own a townhouse. Who decides where the pump truck can stand?

Usually your body corporate, where the driveway or grounds are common property. About one in six Stratford homes were semi-detached, row or terrace houses or townhouses at the 2021 Census. Confirm the truck position with them first, then tell us the space available and we can suggest our 20m compact boom or a line pump run from the street.

How do I check whether my block is on council's flood map?

Council publishes an indicative 1% AEP predicted flood inundation map for the Freshwater, Stratford and Aeroglen area, and you can request an individual property assessment from council for a fee. The map is an indication only, so the property assessment is the check for your own block. If a flood watch is issued before a pour, council advises monitoring the Cairns Disaster Dashboard and BoM warnings, and we will agree a fallback date with you.

We have a two-bedroom place and only a short path to pour. Will you size the pump down?

Yes. At the 2021 Census, 27.0% of Stratford's occupied private dwellings had two bedrooms and 34.6% had four or more, so jobs can range from a short path to a large back-yard slab. Our fleet runs from a 20m compact boom to line pumping and a compact high-pressure line pump, and small pours such as garden paths are welcome. The quote depends on pump size, time on site, travel from Mareeba and any minimum charge.

It's dry at your Mareeba base. Does that mean my Stratford pour will be dry?

Not necessarily. Our rain guide, drawing on Bureau of Meteorology figures, puts Cairns at more than twice Mareeba's annual rainfall, with about 16 rain days a month from January to March against about 10 at Mareeba. We travel from Mareeba on a regular Cairns run, so we check the forecast with you, recheck the set-up ground after rain and agree a fallback date for a wet-season pour.

Who operates the boom when it lifts concrete over the roof?

Our operators are high-risk licensed, as published on our website. They plan the boom path from the set-up spot to the pour and keep the boom at least 3 metres from lines up to 132kV, following our site guide based on Queensland's Concrete Pumping Code of Practice 2019. Point out every overhead line between the street and the pour when you book.